Cable assembly testing, with every build proven before it ships.

Cable assembly testing, with every build proven before it ships.

Electrical, environmental, mechanical, and optical testing run in-house at our California facility, so verification happens where the build happens.

Electrical, environmental, mechanical, and optical testing run in-house at our California facility, so verification happens where the build happens.

We test to your drawing, your spec, and the environment your assembly will actually see. Dielectric withstanding voltage, temperature extremes, humidity, submersion, pull-force and retention, and optical insertion loss are all handled in-house, with no third-party lab in the loop. We can also test to ATPD-2167, Environmental Test Methods for the M1 Tank Program.

Test requirements are agreed during quoting and documented against the lot, so the records your quality team needs ship with the hardware.

We test to your drawing, your spec, and the environment your assembly will actually see. Dielectric withstanding voltage, temperature extremes, humidity, submersion, pull-force and retention, and optical insertion loss are all handled in-house, with no third-party lab in the loop. We can also test to ATPD-2167, Environmental Test Methods for the M1 Tank Program.

Test requirements are agreed during quoting and documented against the lot, so the records your quality team needs ship with the hardware.

Dielectric Withstanding Voltage (Hipot)

Dielectric Withstanding Voltage (Hipot)

Voltage well above the operating rating proves insulation and spacing hold before anything leaves the building.

Voltage well above the operating rating proves insulation and spacing hold before anything leaves the building.

High- & Low-Temperature Testing

High- & Low-Temperature Testing

Assemblies are exposed to the hot and cold limits of your operating envelope to confirm materials, terminations, and seals stay stable. Testing to ATPD-2167 (Environmental Test Methods, M1 Tank Program) is available.

Assemblies are exposed to the hot and cold limits of your operating envelope to confirm materials, terminations, and seals stay stable. Testing to ATPD-2167 (Environmental Test Methods, M1 Tank Program) is available.

Humidity Testing

Humidity Testing

Controlled high-humidity exposure verifies insulation resistance and corrosion performance where moisture is a factor.

Controlled high-humidity exposure verifies insulation resistance and corrosion performance where moisture is a factor.

Submersion Testing

Submersion Testing

Sealed and overmolded assemblies are submerged and checked for ingress at the depth and duration you specify.

Sealed and overmolded assemblies are submerged and checked for ingress at the depth and duration you specify.

Pull-Force & Retention Testing

Pull-Force & Retention Testing

Destructive pull tests qualify crimp tooling, and retention checks confirm contacts stay seated in their housings.

Destructive pull tests qualify crimp tooling, and retention checks confirm contacts stay seated in their housings.

Optical Insertion-Loss Testing

Optical Insertion-Loss Testing

Fiber optic assemblies are measured for insertion loss against your link budget, with results documented for your records.

Fiber optic assemblies are measured for insertion loss against your link budget, with results documented for your records.

Where testing happens in a build.

Where testing happens in a build.

01

01

Test plan

Test plan

Test methods, limits, and sample sizes are aligned with your drawing and spec before we quote.

Test methods, limits, and sample sizes are aligned with your drawing and spec before we quote.

02

02

First article

First article

The first build is fully tested and inspected, so issues surface before production volume.

The first build is fully tested and inspected, so issues surface before production volume.

03

03

In-process checks

In-process checks

Crimp height and pull-force checks at every setup keep terminations inside the qualified window.

Crimp height and pull-force checks at every setup keep terminations inside the qualified window.

04

04

Electrical verification

Electrical verification

Continuity, insulation resistance, and Hipot testing on every assembly.

Continuity, insulation resistance, and Hipot testing on every assembly.

05

05

Environmental & optical

Environmental & optical

Temperature, humidity, submersion, and insertion-loss testing wherever the application calls for it.

Temperature, humidity, submersion, and insertion-loss testing wherever the application calls for it.

06

06

Records & release

Records & release

Results are documented against the lot and released with the shipment.

Results are documented against the lot and released with the shipment.

Need a test plan for your assembly?