Cable assembly testing, with every build proven before it ships.
Cable assembly testing, with every build proven before it ships.
Electrical, environmental, mechanical, and optical testing run in-house at our California facility, so verification happens where the build happens.
Electrical, environmental, mechanical, and optical testing run in-house at our California facility, so verification happens where the build happens.
We test to your drawing, your spec, and the environment your assembly will actually see. Dielectric withstanding voltage, temperature extremes, humidity, submersion, pull-force and retention, and optical insertion loss are all handled in-house, with no third-party lab in the loop. We can also test to ATPD-2167, Environmental Test Methods for the M1 Tank Program.
Test requirements are agreed during quoting and documented against the lot, so the records your quality team needs ship with the hardware.
We test to your drawing, your spec, and the environment your assembly will actually see. Dielectric withstanding voltage, temperature extremes, humidity, submersion, pull-force and retention, and optical insertion loss are all handled in-house, with no third-party lab in the loop. We can also test to ATPD-2167, Environmental Test Methods for the M1 Tank Program.
Test requirements are agreed during quoting and documented against the lot, so the records your quality team needs ship with the hardware.
Dielectric Withstanding Voltage (Hipot)
Dielectric Withstanding Voltage (Hipot)
Voltage well above the operating rating proves insulation and spacing hold before anything leaves the building.
Voltage well above the operating rating proves insulation and spacing hold before anything leaves the building.
High- & Low-Temperature Testing
High- & Low-Temperature Testing
Assemblies are exposed to the hot and cold limits of your operating envelope to confirm materials, terminations, and seals stay stable. Testing to ATPD-2167 (Environmental Test Methods, M1 Tank Program) is available.
Assemblies are exposed to the hot and cold limits of your operating envelope to confirm materials, terminations, and seals stay stable. Testing to ATPD-2167 (Environmental Test Methods, M1 Tank Program) is available.
Humidity Testing
Humidity Testing
Controlled high-humidity exposure verifies insulation resistance and corrosion performance where moisture is a factor.
Controlled high-humidity exposure verifies insulation resistance and corrosion performance where moisture is a factor.
Submersion Testing
Submersion Testing
Sealed and overmolded assemblies are submerged and checked for ingress at the depth and duration you specify.
Sealed and overmolded assemblies are submerged and checked for ingress at the depth and duration you specify.
Pull-Force & Retention Testing
Pull-Force & Retention Testing
Destructive pull tests qualify crimp tooling, and retention checks confirm contacts stay seated in their housings.
Destructive pull tests qualify crimp tooling, and retention checks confirm contacts stay seated in their housings.
Optical Insertion-Loss Testing
Optical Insertion-Loss Testing
Fiber optic assemblies are measured for insertion loss against your link budget, with results documented for your records.
Fiber optic assemblies are measured for insertion loss against your link budget, with results documented for your records.
Where testing happens in a build.
Where testing happens in a build.
01
01
Test plan
Test plan
Test methods, limits, and sample sizes are aligned with your drawing and spec before we quote.
Test methods, limits, and sample sizes are aligned with your drawing and spec before we quote.
02
02
First article
First article
The first build is fully tested and inspected, so issues surface before production volume.
The first build is fully tested and inspected, so issues surface before production volume.
03
03
In-process checks
In-process checks
Crimp height and pull-force checks at every setup keep terminations inside the qualified window.
Crimp height and pull-force checks at every setup keep terminations inside the qualified window.
04
04
Electrical verification
Electrical verification
Continuity, insulation resistance, and Hipot testing on every assembly.
Continuity, insulation resistance, and Hipot testing on every assembly.
05
05
Environmental & optical
Environmental & optical
Temperature, humidity, submersion, and insertion-loss testing wherever the application calls for it.
Temperature, humidity, submersion, and insertion-loss testing wherever the application calls for it.
06
06
Records & release
Records & release
Results are documented against the lot and released with the shipment.
Results are documented against the lot and released with the shipment.
